Rogz

Control Long Lead Pink XL

ONLINE ONLY
$51.99
Rogz Control Long Lead Pink XL
$51.99
4 payments of $13.00 with
logo-afterpay
Loading...

use my location
Online price $51.99
People who bought this also bought

How does it Work?

At the checkout, select Afterpay as your payment method.
Enter your details with Afterpay.
Your order will be shipped as normal.
Your nominated card will be automatically charged every fortnight in 4 equal repayments.

The Control Long Dog Lead by Rogz is the perfect lead for taking control of your dog on walks. Having control of your dog is essential for a happy dog and a happy owner, and the right type of walking equipment can help. The dual function provides an option to reduce pull load and pressure when ShockLoc system is not locked out, allowing the bungee to stretch. Or it can be locked out to prevent the bungee from stretching for improved control.

Features & benefits
  • Shock Absorbing Webbing - Eases the pull strength and pressure placed on your dog.
  • ShocLoc Control - Designed to lock out the absorbing function of the bungee.
  • SnapLoc Trigger Hook - Ensures control and safety for you and your dog.
  • Reflective Stiching - Reflective Yarn woven into webbing and piping for night visibility.
  • Waste Bag Holder - Accessory to hold your waste bag.
Product Sizing: 1.2m

  • Locks shock absorbing webbing
  • Control handle for additional control
  • Lockable trigger hook for added safety
  • Waste Bag holder

Additional info
Price $51.99
Colour Pink
Life Stage All Life Stages
Brand Rogz
Material Nylon
Size XLarge
Advice Care CONTENT: Nylon/Polyester
Product Category Collars & Leads
Reviews Total 0